1MVA + 127.8KW PV
At LOVEDEAN GSP
SSEN Embedded Capacity Register, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 27 Jul 2027
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- 1MVA + 127.8KW PV
- Address
- SENTINEL HOUSE, PORTSMOUTH, HAMPSHIRE, PO3 5RF
- Grid reference
- Easting 467268, northing 102900
- Licence area
- Southern England (SEPD)
- Grid supply point
- LOVEDEAN GSP
- Bulk supply point
- WYMERING
- Primary substation
- HILSEA
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 0.128 MW registered
- Registered capacity
- 0.128 MW
- Change to maximum export capacity
- 1 MW
- Change to maximum import capacity
- 1 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 27 Jul 2026
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 7 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked from the August 2026 edition to the October 2026 edition, across 2 editions. Listed at under 1 MW in the September 2026 edition.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionListed in this edition at under 1 MW
- September 2026 editionListed in this edition at under 1 MW
No change to any detail QueueWatch tracks.
Also at LOVEDEAN GSP
GSP view58 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?