1MVA + 127.8KW PV

At LOVEDEAN GSP

SSEN Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
27 Jul 2027
Status
Accepted to connect
Customer
Not stated
Site name
1MVA + 127.8KW PV
Address
SENTINEL HOUSE, PORTSMOUTH, HAMPSHIRE, PO3 5RF
Grid reference
Easting 467268, northing 102900
Licence area
Southern England (SEPD)
Grid supply point
LOVEDEAN GSP
Bulk supply point
WYMERING
Primary substation
HILSEA
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 0.128 MW registered
Registered capacity
0.128 MW
Change to maximum export capacity
1 MW
Change to maximum import capacity
1 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
27 Jul 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
7 Aug 2026
Tracked since
August 2026 edition

Change history

Found in the August 2026 edition only.

Changes to its status, capacity, technology or customer, newest first.

  • September 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at LOVEDEAN GSP

GSP view

59 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.

See all 59

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose