QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

10MW PV

INTELLIGENT ALTERNATIVES LIMITED at MELKSHAM GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
29 Oct 2027
Status
Accepted to connect
Customer
INTELLIGENT ALTERNATIVES LIMITED
Site name
10MW PV
Address
Not stated
Grid reference
Not stated
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
NORRINGTON
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 10 MW registered
Registered capacity
10 MW
Change to maximum export capacity
10 MW
Change to maximum import capacity
0.105 MW
Flexible connection
Yes
In a connection queue
Not published by SSEN
Date accepted
29 Apr 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition.

Changes to its status, capacity, technology or customer, newest first.

No changes to show: it has been found in one edition.

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2 GW: 0.5 GW connected, 1.5 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose