HALFWAY HOUSE FARM
INTEGRUM RNEWABLE ENERGY at MELKSHAM GSP
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 15 Nov 2037
- Status
- Accepted to connect
- Customer
- INTEGRUM RNEWABLE ENERGY
- Site name
- HALFWAY HOUSE FARM
- Address
- HALFWAY HOUSE FARM, BEANACRE, MELKSHAM, WILTSHIRE, SN12 7QA
- Grid reference
- Easting 391310, northing 166930
- Licence area
- Southern England (SEPD)
- Grid supply point
- MELKSHAM GSP
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 104.2 MW registered
- Registered capacity
- 104.2 MW
- Change to maximum export capacity
- 99.9 MW
- Change to maximum import capacity
- 110.693 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 6 Apr 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- April 2026 edition
Change history
Tracked since the April 2026 edition, across 6 editions.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at MELKSHAM GSP
GSP view95 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2 GW: 0.5 GW connected, 1.5 GW accepted to connect.
- SOLAR PV AND BATTERY 50MW IMPORT 50MW EXPORTLOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED, SolarAccepted50 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose