70MW EXPORT

At MELKSHAM GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
9 Apr 2025
Status
Accepted to connect
Customer
Not stated
Site name
70MW EXPORT
Address
LAND TO THE WEST OF BEANACRE NORRINGTON STATION, MELKSHAM, WILTSHIRE, SN12 8DU
Grid reference
Easting 389793, northing 165167
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Other or not stated
Energy source 1
OTHER, OTHER: 80 MW registered
Registered capacity
80 MW
Change to maximum export capacity
70 MW
Change to maximum import capacity
73.684 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
9 Apr 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
May 2024 edition

Change history

Tracked since the May 2024 edition, across 29 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2 GW: 0.5 GW connected, 1.5 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose