QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Whinfield PV

Whinfield PV at Norton

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
7 Jun 2025
Status
Connected
Customer
Whinfield PV
Site name
Whinfield PV
Address
WHINFIELD HOUSE FARM, BRAFFERTON, DARLINGTON, County Durham, DL1 3LE
Grid reference
Easting 430492, northing 522158
Licence area
North East (Northern Powergrid)
Grid supply point
Norton
Bulk supply point
Darlington North
Primary substation
Whinfield House PV
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 22.99 MW registered
Registered capacity
22.99 MW
Maximum export capacity
22.8 MW
Maximum import capacity
0.095 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
14 Jul 2020
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574200497722
Import MPAN
1580001846217
Last updated
12 Nov 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Norton

GSP view

66 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 66

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose