California Hybrid Solar & BESS
California Hybrid Solar & BESS at Norton
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- California Hybrid Solar & BESS
- Site name
- California Hybrid Solar & BESS
- Address
- CALIFORNIA FARM, CARLTON, STOCKTON-ON-TEES, County Durham, TS21 1ED
- Grid reference
- Easting 439951, northing 521654
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Norton
- Bulk supply point
- California Farm
- Primary substation
- California Farm Direct
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 100 MW registered
- Energy source 2
- Solar, Photovoltaic: 50 MW registered
- Registered capacity
- 150 MW
- Change to maximum export capacity
- 150 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 29 Apr 2020
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 9 Jun 2026
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
- June 2026 editionFlexible connection changed from “no” to “yes”
Also at Norton
GSP view66 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 2.0 GW: 0.4 GW connected, 1.6 GW accepted to connect.
- West House Hybrid PV % BESSWest House Hybrid PV and BESS, Solar, West House PV primaryAccepted100.32 MW
- Hell Hole & Low Middlefield FarmsHell Hole & Low Middlefield Farms, Solar, Hell Hole Farm Direct primaryAccepted80 MW
- Whiley Hill FarmWhiley Hill Farm Hybrid, Solar, Whiley Hill Farm Hybrid Direct primaryAccepted64.296 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?