Wandylaw Windfarm
Wandylaw Windfarm at Blyth 132kV
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 30 Jan 2013
- Status
- Connected
- Planning consent
- Granted on appeal 10 Feb 2008
Northumberland, reference 06/B/0765 · Source: REPD - Customer
- Wandylaw Windfarm
- Site name
- Wandylaw Windfarm
- Address
- Wandylaw Wind Farm, Wandylaw, Chathill, Northumberland, NE67 5HG
- Grid reference
- Easting 414868, northing 625211
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Blyth 132kV
- Bulk supply point
- Linton
- Primary substation
- Wandylaw Windfarm
- Connection voltage
- 66 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 20.5 MW registered
- Registered capacity
- 20.5 MW
- Maximum export capacity
- 20.5 MW
- Maximum import capacity
- Not stated
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574000309375
- Import MPAN
- Not stated
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Blyth 132kV
GSP view8 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 515 MW: 511 MW connected, 4 MW accepted to connect.
- Station Sawmills add CHP and BESSStation Sawmills add CHP and BESS, Gas and other fossil, Denwick primaryAccepted2.8 MW
- Berwick Drift Wind Farm, Park RoadBerwick Drift Wind Farm, Park Road, Wind, Lynemouth primaryConnected2.299 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.