ULGHAM GRANGE

ULGHAM GRANGE at Blyth 132kV

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
21 Jul 2024
Status
Connected
Customer
ULGHAM GRANGE
Site name
ULGHAM GRANGE
Address
ULGHAM GRANGE, ULGHAM, MORPETH, Northumberland, NE61 3AX
Grid reference
Easting 424801, northing 592718
Licence area
North East (Northern Powergrid)
Grid supply point
Blyth 132kV
Bulk supply point
Linton
Primary substation
Linton 66/20kV
Connection voltage
20 kV
Technology group
Other or not stated
Energy source 1
Other, Other: 2 MW registered
Registered capacity
2 MW
Maximum export capacity
2 MW
Maximum import capacity
13.3 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
5 Aug 2019
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
7 Aug 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Blyth 132kV

GSP view

8 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 515 MW: 511 MW connected, 4 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose