Coal Authority Hybrid
Coal Authority Hybrid at Blyth 132kV
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Coal Authority Hybrid
- Site name
- Coal Authority Hybrid
- Address
- The Coal Authority, Lynemouth, Morpeth, Northumberland, NE61 5XH
- Grid reference
- Easting 428974, northing 591092
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Blyth 132kV
- Bulk supply point
- Linton
- Primary substation
- Lynemouth
- Connection voltage
- 20 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 0.8 MW registered
- Energy source 2
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 0.24 MW registered
- Registered capacity
- 1.04 MW
- Change to maximum export capacity
- 1.04 MW
- Change to maximum import capacity
- 0.38 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 15 Dec 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 8 Jan 2026
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Blyth 132kV
GSP view8 other sites at this grid supply point in the November 2026 edition, 1 of them at Lynemouth, the same primary substation. In all, the sites here total 515 MW: 511 MW connected, 4 MW accepted to connect.
- Berwick Drift Wind Farm, Park RoadBerwick Drift Wind Farm, Park Road, Wind, Lynemouth primaryConnected2.299 MW
- Station Sawmills add CHP and BESSStation Sawmills add CHP and BESS, Gas and other fossil, Denwick primaryAccepted2.8 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?