Solar Farm and Battery
Solar Farm and Battery at Norton
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 17 Mar 2017
- Status
- Connected
- Customer
- Solar Farm and Battery
- Site name
- Solar Farm and Battery
- Address
- Low Burntoft Farm, Wolviston, Billingham, County Durham, TS22 5PD
- Grid reference
- Easting 445916, northing 528233
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Norton
- Bulk supply point
- Norton 132/11kV
- Primary substation
- Norton 132/11kV Direct
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 5.415 MW registered
- Registered capacity
- 5.415 MW
- Maximum export capacity
- 5.415 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574000328173
- Import MPAN
- 1574000328164
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Norton
GSP view66 other sites at this grid supply point in the November 2026 edition, 4 of them at Norton 132/11kV Direct, the same primary substation. In all, the sites here total 2.0 GW: 0.4 GW connected, 1.6 GW accepted to connect.
- North Tees Health NHS TrustNorth Tees Health NHS Trust, Gas and other fossil, Norton 132/11kV Direct primaryConnected1.718 MW
- California Hybrid Solar & BESSCalifornia Hybrid Solar & BESS, Storage, California Farm Direct primaryAccepted150 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?