Lambs Hill Wind Farm

Lambs Hill Wind Farm at Norton

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
5 Sep 2016
Status
Connected
Planning consent
Granted 7 Dec 2011
Stockton-on-Tees, reference 10/2549/EIS · Source: REPD
Customer
Lambs Hill Wind Farm
Site name
Lambs Hill Wind Farm
Address
Lambs Hill Wind Farm, Stillington, Stockton-On-Tees, County Durham, TS21 1JX
Grid reference
Easting 437077, northing 523401
Licence area
North East (Northern Powergrid)
Grid supply point
Norton
Bulk supply point
Norton 132/11kV
Primary substation
Norton 132/11kV Direct
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 7.79 MW registered
Registered capacity
7.79 MW
Maximum export capacity
7.79 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574000325429
Import MPAN
Not stated
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Norton

GSP view

66 other sites at this grid supply point in the November 2026 edition, 4 of them at Norton 132/11kV Direct, the same primary substation. In all, the sites here total 2.0 GW: 0.4 GW connected, 1.6 GW accepted to connect.

  • High Meadows 2High Meadows 2, Solar, Norton 132/11kV Direct primaryAccepted8.58 MW
  • Solar Farm and BatterySolar Farm and Battery, Solar, Norton 132/11kV Direct primaryConnected5.415 MW
  • Marlow FoodsMarlow Foods, Gas and other fossil, Norton 132/11kV Direct primaryConnected2.5 MW
  • North Tees Health NHS TrustNorth Tees Health NHS Trust, Gas and other fossil, Norton 132/11kV Direct primaryConnected1.718 MW
  • Mill Lane Solar PVMill Lane Solar PV, Solar, Mill Lane Direct primaryAccepted180 MW
  • Mill Lane Solar PVMill Lane Add BESS, Storage, Mill Lane Direct primaryAccepted180 MW
  • California Hybrid Solar & BESSCalifornia Hybrid Solar & BESS, Storage, California Farm Direct primaryAccepted150 MW
  • Thornley BESSThornley BESS, Storage, Thornley Close Farm Direct primaryAccepted118.5 MW

See all 66

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.