Port Clarence Logisitics Offshore Base PV
Port Clarence Logisitics Offshore Base PV at Norton
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Port Clarence Logisitics Offshore Base PV
- Site name
- Port Clarence Logisitics Offshore Base PV
- Address
- Port Clarence Logisitics Offshore Base PV, Port Clarence Logisitics Offshore Base, Port Clarence Logisitics, County Durham, TS2 1RZ
- Grid reference
- Easting 449825, northing 521653
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Norton
- Bulk supply point
- North Tees
- Primary substation
- North Tees T3 T4
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.26 MW registered
- Registered capacity
- 1.26 MW
- Change to maximum export capacity
- 1.26 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 17 Aug 2026
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 4 Sep 2026
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Norton
GSP view66 other sites at this grid supply point in the November 2026 edition, 3 of them at North Tees T3 T4, the same primary substation. In all, the sites here total 2.0 GW: 0.4 GW connected, 1.6 GW accepted to connect.
- Billingham Tioxide 6MW gas GenBillingham Tioxide 6MW gas Gen, Gas and other fossil, North Tees T3 T4 primaryConnected6 MW
- Cowpen Bewley Landfill SiteCowpen Bewley Landfill Site, Bioenergy and waste, North Tees T3 T4 primaryConnected2.185 MW
- California Hybrid Solar & BESSCalifornia Hybrid Solar & BESS, Storage, California Farm Direct primaryAccepted150 MW
- West House Hybrid PV % BESSWest House Hybrid PV and BESS, Solar, West House PV primaryAccepted100.32 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?