Billingham Tioxide 6MW gas Gen
Billingham Tioxide 6MW gas Gen at Norton
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 25 Oct 2017
- Status
- Connected
- Customer
- Billingham Tioxide 6MW gas Gen
- Site name
- Billingham Tioxide 6MW gas Gen
- Address
- Billingham Tioxide Green Section, Haverton Hill Road, Billingham, County Durham, TS23 1PS
- Grid reference
- Easting 447090, northing 521124
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Norton
- Bulk supply point
- North Tees
- Primary substation
- North Tees T3 T4
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 6 MW registered
- Registered capacity
- 6 MW
- Maximum export capacity
- 6 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 1 Feb 2017
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574000329344
- Import MPAN
- Not stated
- Last updated
- 9 Feb 2018
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Norton
GSP view66 other sites at this grid supply point in the September 2026 edition, 3 of them at North Tees T3 T4, the same primary substation. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.
- Cowpen Bewley Landfill SiteCowpen Bewley Landfill Site, Bioenergy and waste, North Tees T3 T4 primaryConnected2.185 MW
- Port Clarence Logisitics Offshore Base PVPort Clarence Logisitics Offshore Base PV, Solar, North Tees T3 T4 primaryAccepted1.26 MW
- California Hybrid Solar & BESSCalifornia Hybrid Solar & BESS, Storage, California Farm Direct primaryAccepted150 MW
- West House Hybrid PV % BESSWest House Hybrid PV and BESS, Solar, West House PV primaryAccepted100.32 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose