QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Court Green Farm

Court Green Hybrid at Lackenby

Northern Powergrid Embedded Capacity Register 1MW and Over, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Court Green Hybrid
Site name
Court Green Farm
Address
Court Green Farm, Wilton Lane, Guisborough, North Yorkshire, TS14 6QY
Grid reference
Easting 459254, northing 518242
Licence area
North East (Northern Powergrid)
Grid supply point
Lackenby
Bulk supply point
Lackenby
Primary substation
Court Green Farm
Connection voltage
66 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 50 MW registered
Energy source 2
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 75 MW registered
Registered capacity
125 MW
Change to maximum export capacity
125 MW
Change to maximum import capacity
45.03 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
6 Jan 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
15 Aug 2024
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Changes to the details QueueWatch tracks, newest first.

No changes to show: it has been found in one edition.

Also at Lackenby

GSP view

17 other sites at this grid supply point in the October 2026 edition, 1 of them at Court Green Farm, the same primary substation. In all, the sites here total 678 MW: 114 MW connected, 564 MW accepted to connect.

See all 17

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose