Generation Connection, Bolklow Road
Generation Connection, Bolklow Road at Lackenby
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Generation Connection, Bolklow Road
- Site name
- Generation Connection, Bolklow Road
- Address
- Corncroft Mews, Grangetown, Middlesbrough, North Yorkshire, TS6 7HJ
- Grid reference
- Easting 455261, northing 520986
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Lackenby
- Bulk supply point
- Lackenby
- Primary substation
- Grangetown
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 12 MW registered
- Registered capacity
- 12 MW
- Maximum export capacity
- 12 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 17 Jan 2017
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574000330410
- Import MPAN
- 1574000330429
- Last updated
- 9 Feb 2018
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Lackenby
GSP view17 other sites at this grid supply point in the November 2026 edition, 2 of them at Grangetown, the same primary substation. In all, the sites here total 678 MW: 114 MW connected, 564 MW accepted to connect.
- Tees Dock Landfill GasTees Dock Landfill Gas, Bioenergy and waste, Grangetown primaryConnected2.027 MW
- Tees Dock Landfill SiteTees Dock Landfill Site, Bioenergy and waste, Grangetown primaryConnected1.097 MW
- Guisborough Estate 39.6MW Solar PVGuisborough Estate 39.6MW Solar PV, Solar, Guisborough Estate primaryAccepted39.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose