Guisborough BESS
Guisborough BESS at Lackenby
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Planning consent
- Granted 20 Apr 2026
Redcar and Cleveland, reference R/2025/0456/FFM · Source: REPD - Customer
- Guisborough BESS
- Site name
- Guisborough BESS
- Address
- Land at Howlbeck Mill, Guisbrough, Guisbrough, North Yorkshire, TS14 6QX
- Grid reference
- Easting 460682, northing 516888
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Lackenby
- Bulk supply point
- Lackenby
- Primary substation
- Guisborough BESS Direct
- Connection voltage
- 66 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 28 MW registered
- Registered capacity
- 28 MW
- Change to maximum export capacity
- 28 MW
- Change to maximum import capacity
- 266 MW
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 26 Sep 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 7 Oct 2024
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Lackenby
GSP view17 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 678 MW: 114 MW connected, 564 MW accepted to connect.
- Guisborough Estate 39.6MW Solar PVGuisborough Estate 39.6MW Solar PV, Solar, Guisborough Estate primaryAccepted39.6 MW
- Generation Connection, Bolklow RoadGeneration Connection, Bolklow Road, Gas and other fossil, Grangetown primaryConnected12 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.