QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Teesside Windfarm Ltd

Teesside Windfarm Ltd at Lackenby

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jun 2013
Status
Connected
Customer
Teesside Windfarm Ltd
Site name
Teesside Windfarm Ltd
Address
Tod Point Road, Warrenby, Redcarr, North Yorkshire, TS10 5AU
Grid reference
Easting 458068, northing 525162
Licence area
North East (Northern Powergrid)
Grid supply point
Lackenby
Bulk supply point
Lackenby
Primary substation
Warrenby Generation
Connection voltage
66 kV
Technology group
Wind
Energy source 1
Wind, Offshore wind turbines: 62 MW registered
Registered capacity
62 MW
Maximum export capacity
62.1 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574000303940
Import MPAN
1574000303959
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Lackenby

GSP view

17 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 678 MW: 114 MW connected, 564 MW accepted to connect.

See all 17

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?