Bradford Royal Infirmary
Bradford Royal Infirmary at Bradford West
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Bradford Royal Infirmary
- Site name
- Bradford Royal Infirmary
- Address
- Bradford Royal Infirmary, Duckworth Lane, Bradford, West Yorkshire, BD9 6RJ
- Grid reference
- Easting 413520, northing 434489
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Bradford West
- Bulk supply point
- Girlington
- Primary substation
- Four Lane Ends
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 5.094 MW registered
- Energy source 2
- Solar, Photovoltaic: 0.12 MW registered
- Registered capacity
- 5.214 MW
- Maximum export capacity
- 0.778 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Aug 2026
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
- August 2026 editionCapacity changed from 5.094 MW to 5.214 MW
Also at Bradford West
GSP view24 other sites at this grid supply point in the September 2026 edition, 1 of them at Four Lane Ends, the same primary substation. In all, the sites here total 946 MW: 144 MW connected, 802 MW accepted to connect.
- Bradford West A BESSBradford West A BESS, Storage, Bradford West A BESS Direct primaryAccepted200 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose