Cardiff, wentloog avenue
Pinewood studios wales limited at Cardiff East Grid
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 7 Feb 2011
- Status
- Connected
- Customer
- Pinewood studios wales limited
- Site name
- Cardiff, wentloog avenue
- Address
- Seren Studios Wales Wentloog Environmental Centre, Wentloog Avenue, Wentloog, Cardiff, South Glamorgan, CF3 2GH
- Grid reference
- Easting 323573, northing 179269
- Licence area
- South Wales
- Grid supply point
- Cardiff East Grid
- Bulk supply point
- Trowbridge 132/11 Kv S/S
- Primary substation
- Trowbridge Primary
- Connection voltage
- 11 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 2.3 MW registered
- Registered capacity
- 2.3 MW
- Maximum export capacity
- 2.185 MW
- Maximum import capacity
- 0.38 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2100040975990
- Import MPAN
- 2199989282557
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Cardiff East Grid
GSP view9 other sites at this grid supply point in the August 2026 edition, 1 of them at Trowbridge Primary, the same primary substation. In all, the sites here total 217 MW: 63 MW connected, 154 MW accepted to connect.
- Landfill site generation staion, lamby way, rumney, cardiffCardiff city council, Bioenergy and waste, Trowbridge Primary primaryConnected5.84 MW
- Generator section unit 48 portmanmoor rd rover wayRhymney power limited, Gas and other fossil, Rover Way Primary primaryConnected10 MW
- Unit 48, , import mpan power plus limited stor geninfinis energy storage limited, Storage, Rover Way Primary primaryAccepted10 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose