QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Cardiff, viridor trident park efw

Viridor trident park limited at Cardiff East Grid

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
31 Mar 2014
Status
Connected
Customer
Viridor trident park limited
Site name
Cardiff, viridor trident park efw
Address
Trident Park Generation, Off Ocean Way, Glass Avenue, Cardiff, South Glamorgan, CF24 5EN
Grid reference
Easting 320241, northing 175410
Licence area
South Wales
Grid supply point
Cardiff East Grid
Bulk supply point
Cardiff Central Grid
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Steam turbine (thermal power plant): 39.7 MW registered
Registered capacity
39.7 MW
Maximum export capacity
34.983 MW
Maximum import capacity
4.75 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2100041142381
Import MPAN
2100041142372
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Cardiff East Grid

GSP view

9 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 217 MW: 63 MW connected, 154 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?