Pant y moch farm, mynydd emroc

Pant y moch renewables limited at Swansea North Grid

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Nov 2015
Status
Connected
Planning consent
Granted 31 Oct 2014
Neath Port Talbot, reference P2014/0567 · Source: REPD
Customer
Pant y moch renewables limited
Site name
Pant y moch farm, mynydd emroc
Address
Pantymoch Farm, Penycae, Port talbot, West Glamorgan, SA13 2UT
Grid reference
Easting 277887, northing 189892
Licence area
South Wales
Grid supply point
Swansea North Grid
Bulk supply point
Briton Ferry Grid
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 9.984 MW registered
Registered capacity
9.984 MW
Maximum export capacity
4.218 MW
Maximum import capacity
0.024 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2100041320691
Import MPAN
2100041320682
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Swansea North Grid

GSP view

86 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 1.2 GW: 0.6 GW connected, 0.6 GW accepted to connect.

See all 86

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.