Pencoed llwchwr

windel solar 11 ltd at Swansea North Grid

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Mar 2028
Status
Accepted to connect
Customer
windel solar 11 ltd
Site name
Pencoed llwchwr
Address
Pendderi Road, Llanelli, Dyfed, SA14 9PL
Grid reference
Easting 2548530, northing 2000120
Licence area
South Wales
Grid supply point
Swansea North Grid
Bulk supply point
Trostre Grid
Primary substation
Maesarddafen
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 26 MW registered
Registered capacity
26 MW
Change to maximum export capacity
26 MW
Change to maximum import capacity
0.2 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
4 Sep 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Swansea North Grid

GSP view

86 other sites at this grid supply point in the August 2026 edition, 1 of them at Maesarddafen, the same primary substation. In all, the sites here total 1.2 GW: 0.6 GW connected, 0.6 GW accepted to connect.

See all 86

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose