Distribution / NGED / Grid supply point

Feckenham 66 11Kv S Stn

Grid supply point in West Midlands

NGED Embedded Capacity Register, August 2026 edition

50sites of 1 MW and over
678 MWcapacity
398 MWconnected (39 sites)
280 MWaccepted to connect (11 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar39545 MW335 MW210 MW
Storage470.8 MW1 MW69.8 MW
Gas and other fossil531 MW31 MW–
Other or not stated230.9 MW30.9 MW–

Storage capacity in MWh: not published by NGED.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the August 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
Feckenham 66/11Kv345.2 MW–
Feckenham 66/11Kv942.3 MW–
Feckenham 66/11Kv2–39.5 MW
Feckenham 66/11Kv612.3 MW25 MW
Feckenham 66/11Kv35.4 MW26 MW
Feckenham 66/11Kv127 MW–
Feckenham 66/11Kv1–25 MW
Feckenham 66/11Kv125 MW–
Feckenham 66/11Kv49.5 MW4.9 MW
Feckenham 66/11Kv29.6 MW–
Feckenham 66/11Kv26.7 MW1.9 MW
Feckenham 66/11Kv15 MW–
Feckenham 66/11Kv14.2 MW–
Feckenham 66/11Kv13.9 MW–
Feckenham 66/11Kv11 MW–
Feckenham 66/11Kv11 MW–
Feckenham 66/11Kv8199 MW15 MW
Not stated3–143 MW

What changed recently

Changes to the sites here found in both of two consecutive monthly editions, the latest first.

QueueWatch holds one edition of NGED's register so far, the August 2026 edition, so there is nothing to compare yet.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.