Wroxton pv array

Pv growth ltd at Feckenham 66 11Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
31 Mar 2014
Status
Connected
Customer
Pv growth ltd
Site name
Wroxton pv array
Address
Wroxton Pv Array, Ironstone Road, Wroxton, Banbury, Oxfordshire, OX15 6ED
Grid reference
Easting 440131, northing 242371
Licence area
West Midlands
Grid supply point
Feckenham 66 11Kv S Stn
Bulk supply point
Feckenham 66/11Kv
Primary substation
Epwell 66 11Kv S Stn
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 1.5 MW registered
Registered capacity
1.5 MW
Maximum export capacity
1.425 MW
Maximum import capacity
0.067 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1470000299469
Import MPAN
1470000299478
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Feckenham 66 11Kv S Stn

GSP view

49 other sites at this grid supply point in the August 2026 edition, 3 of them at Epwell 66 11Kv S Stn, the same primary substation. In all, the sites here total 678 MW: 398 MW connected, 280 MW accepted to connect.

  • Epwell pv arraySunsave 43 (epwell) limited, Solar, Epwell 66 11Kv S Stn primaryConnected7 MW
  • Epwell besssolarig development uk ltd, Storage, Epwell 66 11Kv S Stn primaryAccepted4.86 MW
  • --redacted--Name withheld in the register, Solar, Epwell 66 11Kv S Stn primaryConnected1 MW
  • West and east sides ofNextpower lower strensham limited, SolarAccepted78 MW
  • BessBattery storage projects limited, StorageAccepted49.9 MW
  • Croome airfield solar farmCroome airfield solar limited, SolarConnected45.7 MW
  • Crimscote fields farmRegener8 spv 1 limited, SolarConnected42.35 MW
  • Northwick estateNorthwick gridco, Solar, Broadway 66 11Kv S Stn primaryConnected39.72 MW

See all 49

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?