The rushes drayton manor farm
The rushes solar limited at Feckenham 66 11Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 31 Mar 2016
- Status
- Connected
- Customer
- The rushes solar limited
- Site name
- The rushes drayton manor farm
- Address
- The Rushes, Drayton Manor Farm, Alcester Road, Stratford upon avon, Warwickshire, CV37 9RQ
- Grid reference
- Easting 415454, northing 255630
- Licence area
- West Midlands
- Grid supply point
- Feckenham 66 11Kv S Stn
- Bulk supply point
- Feckenham 66/11Kv
- Primary substation
- Drayton Farm North 66/11Kv
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 4.18 MW registered
- Registered capacity
- 4.18 MW
- Maximum export capacity
- 3.971 MW
- Maximum import capacity
- 0.048 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1470000576665
- Import MPAN
- 1470000576692
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Feckenham 66 11Kv S Stn
GSP view49 other sites at this grid supply point in the August 2026 edition, 8 of them at Drayton Farm North 66/11Kv, the same primary substation. In all, the sites here total 678 MW: 398 MW connected, 280 MW accepted to connect.
- Poplars drayton manor farmWarwickshire community energy cic, Solar, Drayton Farm North 66/11Kv primaryConnected5.408 MW
- The willows drayton farm stratford upon avonWest midlands community energy cic, Solar, Drayton Farm North 66/11Kv primaryConnected5.215 MW
- Lucern solar drayton farm stratfordLucern solar cic, Solar, Drayton Farm North 66/11Kv primaryConnected4.993 MW
- The oaks drayton farm stratford upon avonThe oaks solar cic, Solar, Drayton Farm North 66/11Kv primaryConnected4.993 MW
- The leys drayton manor fmLeys solar energy cic, Solar, Drayton Farm North 66/11Kv primaryConnected4.98 MW
- The beeches drayton manor farmBeeches solar limited, Solar, Drayton Farm North 66/11Kv primaryConnected4.235 MW
- Sheep shed drayton manor farmSheep shed solar limited, Solar, Drayton Farm North 66/11Kv primaryConnected4.208 MW
- Brookside drayton manor fmBrookside solar farm limited, Solar, Drayton Farm North 66/11Kv primaryConnected4.125 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?