WITHINGTON COMMUNITY HOSPITAL
SODEXO LIMITED at SOUTH MANCHESTER GSP
ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 15 Mar 2003
- Status
- Connected
- Customer
- SODEXO LIMITED
- Site name
- WITHINGTON COMMUNITY HOSPITAL
- Address
- NELL LANE, MANCHESTER, GREATER MANCHESTER, M20 2LR
- Grid reference
- Easting 383690, northing 392169
- Licence area
- North West England (ENWL)
- Grid supply point
- SOUTH MANCHESTER GSP
- Bulk supply point
- WEST DIDSBURY
- Primary substation
- WEST DIDSBURY
- Connection voltage
- 6.6 kV
- Technology group
- Gas and other fossil
- Energy source 1
- FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 1 MW registered
- Registered capacity
- 1 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0.428 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- 1620001266889
- Last updated
- 6 Dec 2021
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at SOUTH MANCHESTER GSP
GSP view21 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 541 MW: 99 MW connected, 442 MW accepted to connect.
- MATTHEWS FARM GENERATIONUK POWER RESERVE STYAL ROAD, Gas and other fossil, MOSS NOOK PRIMARY primaryConnected10 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose