MATTHEWS FARM GENERATION

UK POWER RESERVE STYAL ROAD at SOUTH MANCHESTER GSP

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Feb 2002
Status
Connected
Customer
UK POWER RESERVE STYAL ROAD
Site name
MATTHEWS FARM GENERATION
Address
STYAL ROAD, STYAL ROAD, MANCHESTER, GREATER MANCHESTER, M22 5YA
Grid reference
Easting 383803, northing 384926
Licence area
North West England (ENWL)
Grid supply point
SOUTH MANCHESTER GSP
Bulk supply point
MOSS NOOK
Primary substation
MOSS NOOK PRIMARY
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 10 MW registered
Registered capacity
10 MW
Maximum export capacity
10 MW
Maximum import capacity
0.147 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1620000992891
Import MPAN
1620000992882
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at SOUTH MANCHESTER GSP

GSP view

21 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 541 MW: 99 MW connected, 442 MW accepted to connect.

See all 21

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose