QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

CEL BRIDGEWATER BESS

CRAGSIDE ENERGY LIMITED at SOUTH MANCHESTER GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
CRAGSIDE ENERGY LIMITED
Site name
CEL BRIDGEWATER BESS
Address
FAIRY LANE, SALE, LANCASHIRE, M33 2JU
Grid reference
Easting 381043, northing 391572
Licence area
North West England (ENWL)
Grid supply point
SOUTH MANCHESTER GSP
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Storage
Energy source 1
BATTERY STORAGE, STORAGE - ELECTROCHEMICAL (BATTERIES): 90 MW registered
Registered capacity
90 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
90 MW
Change to maximum import capacity
90 MW
Flexible connection
No
In a connection queue
No
Date accepted
5 Sep 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Mar 2024
Tracked since
May 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at SOUTH MANCHESTER GSP

GSP view

21 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 541 MW: 99 MW connected, 442 MW accepted to connect.

  • MOSS NOOKNOVENTUM POWER LIMITED, StorageAccepted100 MW
  • SALE BESSSTOR POWER DEVELOPMENTS, StorageAccepted99.9 MW
  • MOSS NOOK BESS 2LIGHTSOURCE RENEWABLE, StorageAccepted70 MW
  • SOUTH MANCHESTER BESS24 POWER LTD, StorageAccepted70 MW
  • FAIRY LANE (ESS OPTION)WEST DIDSBURY STORAGE LTD, StorageConnected49.9 MW
  • ELEVATOR ROADBIOGAS TECHNOLOGY LIMITED, Gas and other fossil, TRAFFORD primaryConnected21.053 MW
  • MATTHEWS FARM GENERATIONUK POWER RESERVE STYAL ROAD, Gas and other fossil, MOSS NOOK PRIMARY primaryConnected10 MW
  • KELLOGGSKELLOGG COMPANY OF GREAT BRITAIN, LIMITED, Gas and other fossil, PRIVATE SUBSTATION primaryConnected4 MW

See all 21

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?