TAYLOR ROAD
ALKANE ENERGY UK LTD at CARRINGTON ENWL SGTS 1B 2B 4 7
ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- ALKANE ENERGY UK LTD
- Site name
- TAYLOR ROAD
- Address
- TRAFFORD, MANCHESTER, GREATER MANCHESTER, M41 7SW
- Grid reference
- Easting 377083, northing 397220
- Licence area
- North West England (ENWL)
- Grid supply point
- CARRINGTON ENWL SGTS 1B 2B 4 7
- Bulk supply point
- BARTON
- Primary substation
- TO BE CONFIRMED
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- FOSSIL - COAL GAS, ENGINE (COMBUSTION / RECIPROCATING): 16 MW registered
- Registered capacity
- 19.848 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0 MW
- Change to maximum export capacity
- 15.2 MW
- Change to maximum import capacity
- 0.475 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- 5 Oct 2016
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Mar 2024
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at CARRINGTON ENWL SGTS 1B 2B 4 7
GSP view15 other sites at this grid supply point in the September 2026 edition, 1 of them at TO BE CONFIRMED, the same primary substation. In all, the sites here total 212 MW: 156 MW connected, 56 MW accepted to connect.
- IRLAM HYDROPOWER STATION, MANCHESTERRENEWABLES FIRST LTD, Hydro and marine, TO BE CONFIRMED primaryConnected1.435 MW
- PEEL INDUSTRIAL ESTATE, CHAMBERHALL STREETUNITED UTILITIES WATER LTD, Bioenergy and waste, DAVYHULME primaryConnected12.1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose