IRLAM HYDROPOWER STATION, MANCHESTER
RENEWABLES FIRST LTD at CARRINGTON ENWL SGTS 1B 2B 4 7
ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- RENEWABLES FIRST LTD
- Site name
- IRLAM HYDROPOWER STATION, MANCHESTER
- Address
- CADISHEAD WAY, URMSTON, MANCHESTER, GREATER MANCHESTER, M44 6RT
- Grid reference
- Easting 372765, northing 394097
- Licence area
- North West England (ENWL)
- Grid supply point
- CARRINGTON ENWL SGTS 1B 2B 4 7
- Bulk supply point
- CARRINGTON BSP
- Primary substation
- TO BE CONFIRMED
- Connection voltage
- 6.6 kV
- Technology group
- Hydro and marine
- Energy source 1
- WATER (FLOWING WATER OR HEAD OF WATER), HYDRO - RUN OF RIVER: 1.435 MW registered
- Registered capacity
- 1.435 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0 MW
- Change to maximum export capacity
- 0.95 MW
- Change to maximum import capacity
- 0.038 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- 5 Dec 2018
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Mar 2024
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
- September 2026 editionCapacity changed from 1 MW to 1.435 MW
Also at CARRINGTON ENWL SGTS 1B 2B 4 7
GSP view15 other sites at this grid supply point in the September 2026 edition, 1 of them at TO BE CONFIRMED, the same primary substation. In all, the sites here total 212 MW: 156 MW connected, 56 MW accepted to connect.
- PEEL INDUSTRIAL ESTATE, CHAMBERHALL STREETUNITED UTILITIES WATER LTD, Bioenergy and waste, DAVYHULME primaryConnected12.1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose