QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

SHEFFIELD ROAD

PULSE CLEAN ENERGY at STALYBRIDGE GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
17 Jan 2025
Status
Connected
Planning consent
Granted 26 Sep 2022
Tameside, reference 22/00110/FUL · Source: REPD
Customer
PULSE CLEAN ENERGY
Site name
SHEFFIELD ROAD
Address
SHEFFIELD ROAD, HYDE, MANCHESTER, SK14 4AF
Grid reference
Easting 395750, northing 395490
Licence area
North West England (ENWL)
Grid supply point
STALYBRIDGE GSP
Bulk supply point
HYDE
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 42 MW registered
Registered capacity
42 MW
Maximum export capacity
42 MW
Maximum import capacity
42 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Mar 2024
Tracked since
May 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at STALYBRIDGE GSP

GSP view

28 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 366 MW: 174 MW connected, 192 MW accepted to connect.

See all 28

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.