QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BUXTON 2 BESS

S&L ENERGY LTD at STALYBRIDGE

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
S&L ENERGY LTD
Site name
BUXTON 2 BESS
Address
WATERSWALLOWS LANE 2, BUXTON, CHESHIRE, SK17 7JB
Grid reference
Easting 408261, northing 375282
Licence area
North West England (ENWL)
Grid supply point
STALYBRIDGE
Bulk supply point
BUXTON
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
BATTERY: 20 MW registered
Registered capacity
20 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
20 MW
Change to maximum import capacity
20 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
8 Jul 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
21 Aug 2023
Tracked since
May 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at STALYBRIDGE GSP

GSP view

28 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 366 MW: 174 MW connected, 192 MW accepted to connect.

See all 28

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?