MAN AIRPORT (AMAZON) PV ARRAY
MANCHESTER AIRPORT GROUP at SOUTH MANCHESTER
ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- MANCHESTER AIRPORT GROUP
- Site name
- MAN AIRPORT (AMAZON) PV ARRAY
- Address
- 4TH FLOOR OLYMPIC HOUSE, MANCHESTER AIRPORT, MANCHESTER, GREATER MANCHESTER, M90 1QX
- Grid reference
- Easting 382113, northing 385258
- Licence area
- North West England (ENWL)
- Grid supply point
- SOUTH MANCHESTER
- Bulk supply point
- MOSS NOOK
- Primary substation
- MANCHESTER AIRPORT
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 1.6 MW registered
- Registered capacity
- 1.6 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0 MW
- Change to maximum export capacity
- 0 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- 22 Nov 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Mar 2024
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at SOUTH MANCHESTER GSP
GSP view21 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 541 MW: 99 MW connected, 442 MW accepted to connect.
- MATTHEWS FARM GENERATIONUK POWER RESERVE STYAL ROAD, Gas and other fossil, MOSS NOOK PRIMARY primaryConnected10 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose