QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

EDDIE ROCKERS LTD, GRANADA TV

GREAT JOHN STREET HOTEL LIMITED at SOUTH MANCHESTER GSP

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Sep 2001
Status
Connected
Customer
GREAT JOHN STREET HOTEL LIMITED
Site name
EDDIE ROCKERS LTD, GRANADA TV
Address
WATER STREET, MANCHESTER, GREATER MANCHESTER, M60 9EA
Grid reference
Easting 382989, northing 397929
Licence area
North West England (ENWL)
Grid supply point
SOUTH MANCHESTER GSP
Bulk supply point
BLOOM ST
Primary substation
KNOTT MILL
Connection voltage
6.6 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 1.295 MW registered
Registered capacity
1.295 MW
Maximum export capacity
0 MW
Maximum import capacity
0.094 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
1600000005816
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at SOUTH MANCHESTER GSP

GSP view

21 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 541 MW: 99 MW connected, 442 MW accepted to connect.

See all 21

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose