DOBSON PARK WAY GEN 2
ALKANE ENERGY CM LIMITED at WASHWAY FARM GSP / KIRKBY GSP GROUP
ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Aug 2017
- Status
- Connected
- Customer
- ALKANE ENERGY CM LIMITED
- Site name
- DOBSON PARK WAY GEN 2
- Address
- DOBSON PARK WAY, INCE, WIGAN, GREATER MANCHESTER, WN2 2EG
- Grid reference
- Easting 360265, northing 405069
- Licence area
- North West England (ENWL)
- Grid supply point
- WASHWAY FARM GSP / KIRKBY GSP GROUP
- Bulk supply point
- WIGAN
- Primary substation
- GREEN ST T12 & T13
- Connection voltage
- 6.6 kV
- Technology group
- Gas and other fossil
- Energy source 1
- FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 3.2 MW registered
- Registered capacity
- 3.2 MW
- Maximum export capacity
- 2.85 MW
- Maximum import capacity
- 0.332 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1640000665386
- Import MPAN
- 1640000665377
- Last updated
- 6 Dec 2021
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at WASHWAY FARM GSP / KIRKBY GSP GROUP
GSP view17 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 278 MW: 132 MW connected, 146 MW accepted to connect.
- BLAGUEGATE WORKSUTILITY ENGINEERING SOLUTIONS LTD, Gas and other fossil, SKELMERSDALE primaryConnected7.952 MW
- PADDOCK ROADSCA HYGIENE PRODUCTS UK LIMITED, Gas and other fossil, PRIVATE SUBSTATION primaryConnected6.3 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose