Distribution / Sites / Customer

ALKANE ENERGY CM LIMITED

Customer named in the DNOs' registers

In NGED's August 2026 and ENWL's September 2026 editions

The registers spell this customer’s name more than one way: “ALKANE ENERGY CM LIMITED” (4 sites) and “Alkane energy cm limited” (3 sites).

7sites of 1 MW and over
44.5 MWcapacity
44.5 MWconnected (7 sites)
–accepted to connect (0 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
NGEDAugust 2026 edition326.1 MW26.1 MW–
ENWLSeptember 2026 edition418.4 MW18.4 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Gas and other fossil638.5 MW38.5 MW–
Bioenergy and waste16 MW6 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Rhodia storNGEDChesterfield 132Kv S StnGas and other fossilConnected16
Ex-summit colliery site kirkby in ashfieldNGEDChesterfield 132Kv S StnBioenergy and wasteConnected6
LEOPOLD STENWLWASHWAY FARM GSP / KIRKBY GSP GROUPGas and other fossilConnected6
UNIT 1ENWLKEARSLEY 132 GSPGas and other fossilConnected6
Telford energy park halesfield 23NGEDIronbridge 132Kv S StnGas and other fossilConnected4.082
DOBSON PARK WAY GEN 1ENWLWASHWAY FARM GSP / KIRKBY GSP GROUPGas and other fossilConnected3.2
DOBSON PARK WAY GEN 2ENWLWASHWAY FARM GSP / KIRKBY GSP GROUPGas and other fossilConnected3.2

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Chesterfield 132Kv S StnNGED222 MW–
WASHWAY FARM GSP / KIRKBY GSP GROUPENWL312.4 MW–
KEARSLEY 132 GSPENWL16 MW–
Ironbridge 132Kv S StnNGED14.1 MW–

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

ENWL, May 2026 edition to September 2026 edition, for this customer's sites: 4 sites matched. Every May site and every September site had a match in the other edition.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose