SEFTON RD

HERO FUTURE ENERGIES GLOBAL LIMITED at WASHWAY FARM GSP / KIRKBY GSP GROUP

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
HERO FUTURE ENERGIES GLOBAL LIMITED
Site name
SEFTON RD
Address
LAND NORTH OF SEFTON ROAD, SEFTON ROAD, WIGAN, WN5 8UR
Grid reference
Easting 352742, northing 404465
Licence area
North West England (ENWL)
Grid supply point
WASHWAY FARM GSP / KIRKBY GSP GROUP
Bulk supply point
ORRELL
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 20 MW registered
Registered capacity
20 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
20 MW
Change to maximum import capacity
20 MW
Flexible connection
No
In a connection queue
No
Date accepted
8 Mar 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
5 Apr 2022
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at WASHWAY FARM GSP / KIRKBY GSP GROUP

GSP view

17 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 278 MW: 132 MW connected, 146 MW accepted to connect.

  • ORRELL BESSUKGEA 1 LIMITED, StorageAccepted70 MW
  • ORRELL BESSCORIOLIS ENERGY, StorageAccepted52.526 MW
  • STEELPOINT BESSAMBER ENERGY STORAGE XL LIMITED, StorageConnected49.9 MW
  • PIMBO ROADPIMBO GENERATION LIMITED, Gas and other fossilConnected21.052 MW
  • STANLEY WAY GENERATIONMY POWER UK, Gas and other fossil, SKELMERSDALE primaryConnected20.28 MW
  • BLAGUEGATE WORKSUTILITY ENGINEERING SOLUTIONS LTD, Gas and other fossil, SKELMERSDALE primaryConnected7.952 MW
  • PADDOCK ROADSCA HYGIENE PRODUCTS UK LIMITED, Gas and other fossil, PRIVATE SUBSTATION primaryConnected6.3 MW
  • LANDSDALE NURSERIESLANSDALE NURSERIES LIMITED, Gas and other fossil, SCARISBRICK primaryConnected6 MW

See all 17

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose