BLAGUEGATE WORKS
UTILITY ENGINEERING SOLUTIONS LTD at WASHWAY FARM GSP / KIRKBY GSP GROUP
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- UTILITY ENGINEERING SOLUTIONS LTD
- Site name
- BLAGUEGATE WORKS
- Address
- STANLEY WAY, SKELMERSDALE, LANCASHIRE, WN8 8EA
- Grid reference
- Easting 346935, northing 407521
- Licence area
- North West England (ENWL)
- Grid supply point
- WASHWAY FARM GSP / KIRKBY GSP GROUP
- Bulk supply point
- SKELMERSDALE
- Primary substation
- SKELMERSDALE
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 7.952 MW registered
- Registered capacity
- 7.952 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0 MW
- Change to maximum export capacity
- 7.554 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- 3 Sep 2017
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1640000876530
- Import MPAN
- 1640000876520
- Last updated
- 14 Mar 2024
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at WASHWAY FARM GSP / KIRKBY GSP GROUP
GSP view17 other sites at this grid supply point in the October 2026 edition, 3 of them at SKELMERSDALE, the same primary substation. In all, the sites here total 278 MW: 132 MW connected, 146 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?