LITTLE MARLOW TWUL PV
THAMES WATER UTILITIES LTD at AMERSHAM
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 1 May 2025
- Status
- Accepted to connect
- Customer
- THAMES WATER UTILITIES LTD
- Site name
- LITTLE MARLOW TWUL PV
- Address
- LITTLE MARLOW TWUL PV, MUSCHALLIK ROAD OFF A4155 LITTLE MARLOW, MARLOW, BUCKINGHAMSHIRE, SL7 3RY
- Grid reference
- Easting 487523, northing 187736
- Licence area
- Southern England (SEPD)
- Grid supply point
- AMERSHAM
- Bulk supply point
- LOUDWATER
- Primary substation
- WELL END
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 1.579 MW registered
- Registered capacity
- 1.5 MW
- Change to maximum export capacity
- 0.999 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 1 May 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 38 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at AMERSHAM
GSP view4 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 242 MW: 41 MW connected, 201 MW accepted to connect.
- VEOLIA ENVIRONMENTAL SERVICESVEOLIA ENVIRONMENTAL SERVICES, Bioenergy and waste, FLACKWELL HEATH primaryConnected1.33 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose