QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

INNOGY RENEWABLES UK LIMITED

Customer named in the DNOs' registers

In NGED's August 2026, SSEN's September 2026, SPEN's September 2026 and ENWL's September 2026 editions

The registers spell this customer’s name more than one way: “INNOGY RENEWABLES UK LIMITED” (7 sites), “Innogy Renewables Uk Ltd” (2 sites) and “Innogy renewables uk limited” (1 site).

10sites of 1 MW and over
152 MWcapacity
93 MWconnected (8 sites)
59 MWaccepted to connect (2 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
NGEDAugust 2026 edition157.4 MW57.4 MW–
SSENSeptember 2026 edition38.9 MW8.9 MW–
SPENSeptember 2026 edition259.4 MW–59.4 MW
ENWLSeptember 2026 edition426.5 MW26.5 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Wind8147 MW87 MW60 MW
Hydro and marine25.7 MW5.7 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Brechfa forest west wind farmNGEDSwansea North GridWindConnected57.4
Alwens ForestSPENSt AsaphWindAccepted to connect32.5
Alwens Forest extensionSPENSt AsaphWindAccepted to connect26.9
HELLRIGG WIND FARMENWLHARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPWindConnected10
HAMELDON HILL WIND FARM 1ENWLPADIHAM GSPWindConnected6
HAMELDON HILL WIND FARM 2ENWLPADIHAM GSPWindConnected6
HAMELDON HILL WIND FARMENWLPADIHAM GSPWindConnected4.5
GENERATING STATIONSSENALNESSHydro and marineConnected3.8
CORRIEGARTH HYDRO GEN AUXSSENINVERNESSWindConnected3.23
GRUDIE HYDROSSENGRUDIE BRIDGEHydro and marineConnected1.9

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
St AsaphSPEN2–59.4 MW
Swansea North GridNGED157.4 MW–
PADIHAM GSPENWL316.5 MW–
HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPENWL110 MW–
ALNESSSSEN13.8 MW–
INVERNESSSSEN13.2 MW–
GRUDIE BRIDGESSEN11.9 MW–

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

SSEN, August 2026 edition to September 2026 edition, for this customer's sites: 3 sites matched. Every August site and every September site had a match in the other edition.

SPEN, August 2026 edition to September 2026 edition, for this customer's sites: 2 sites matched. Every August site and every September site had a match in the other edition.

ENWL, May 2026 edition to September 2026 edition, for this customer's sites: 4 sites matched. Every May site and every September site had a match in the other edition.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose