QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Delays and exits in the transmission queue since 2021How often connection dates move, and how many projects leave the queue. Gate 2 in the transmission queueHow much of the queue has a Gate 2 offer, and what it did to connection dates. The battery queue and CMP470’s commitment feeHow far the battery queue sits above the line that would switch CMP470’s commitment fee off. Changes of customer in the transmission queueHow often connection agreements move between companies, and how those projects fared. Do projects connect on time?How late stages have connected against their connection date in the register. Which connection dates slip least?Which connection dates are pushed back least, allowing for how far ahead they are. Grid outages and the connections due by 2030How many of their planned outages the transmission owners carry out, against the connections due by 2030.

More analyses are on the way.

Transmission / Projects / Substation

Whitelee Extension 275/33kV

South Scotland, SP Energy Networks

2projects in the register
121 MWstill to connect
0 MWof that with Gate 2 offers
206 MWconnected now

The queue at this substation

ProjectCustomerTechnologyQueued MWConnection dateGateStatus
Whitelee ExtensionScottish Power Renewables (UK) LimitedStorage with solar or wind321 Dec 2026Not statedBuilt
Airtnoch BESSTURBINE MARKETING SPV LIMITEDStorage8929 Sep 2027Gate 1Awaiting Consents

Left the register since January 2021: Airtnoch BESS (89 MW).

Recent changes

  • Airtnoch BESSSouth Scotland, StorageMarked as Gate 1
  • Airtnoch BESSSouth Scotland, SolarLeft the register (89 MW from 29 Sep 2027)89 MW
  • Airtnoch BESSSouth Scotland, StorageAgreement type changed from Embedded to Direct Connection
  • Whitelee ExtensionSouth Scotland, Storage with solar or windTechnology changed from Storage, Solar, Onshore wind to Storage, Solar, Onshore wind, Hydrogen
  • Whitelee ExtensionSouth Scotland, Storage with solar or windConnection date moved from 31 Mar 2023 to 1 Dec 2026 (+44 months)+44 mo
  • Whitelee ExtensionSouth Scotland, Storage with solar or windTechnology changed from Onshore wind to Storage, Solar, Onshore wind
  • Airtnoch BESSSouth Scotland, SolarRenamed from Lochgoin Solar Farm
  • Airtnoch BESSSouth Scotland, SolarConnection date moved from 1 Aug 2024 to 29 Sep 2027 (+38 months)+38 mo
  • Airtnoch BESSSouth Scotland, StorageAdded to the registerNew
  • Whitelee ExtensionSouth Scotland, Storage with solar or windSubstation name updated in the register (from Whitelee Extension to Whitelee Extension 275/33kV)
  • Airtnoch BESSSouth Scotland, SolarSubstation name updated in the register (from Whitelee Extension to Whitelee Extension 275/33kV)
  • Whitelee ExtensionSouth Scotland, Storage with solar or windCapacity changed from 0 MW to 32 MW
  • Whitelee ExtensionSouth Scotland, Storage with solar or windConnection date set to 31 Mar 2023
  • Airtnoch BESSSouth Scotland, SolarConnection date moved from 25 Aug 2023 to 1 Aug 2024 (+11 months)+11 mo
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Status definitions (NESO)

Scoping: NESO is not aware that a planning application has been made.

Awaiting Consents: NESO is aware, or the customer has told it, that a planning application has been made.

Consents Approved: NESO is aware, or the customer has told it, that the planning application has been approved.

Terminated: used by NESO only in its register of 30 April 2021, for two projects that left the register the next month.

These statuses are NESO’s, not QueueWatch’s, and NESO describes them as “as far as we are aware”, so a project may be further along than its status shows.

Source: NESO