Keadby 400kV Substation
England and Wales, National Grid Electricity Transmission
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Keadby North Power Station | Keadby Generation Limited | Thermal (gas, biomass, waste) | 892 | 31 Oct 2031 | Not stated | Awaiting Consents |
| Keadby South Power Station | Keadby Generation Limited | Thermal (gas, biomass, waste) | 155 | 30 Apr 2034 | Not stated | Built |
| Brigg | CBS ENERGY STORAGE ASSETS UK LIMITED | Thermal (gas, biomass, waste) | 0 | Connected | Not stated | Built |
| Keadby II | Keadby Generation Limited | Thermal (gas, biomass, waste) | 0 | Connected | Not stated | Built |
Left the register since January 2021: Keadby (0 MW).
Recent changes
- KeadbyEngland and Wales, Thermal (gas, biomass, waste)Left the register (910 MW connected)0 MW
- KeadbyEngland and Wales, Thermal (gas, biomass, waste)Added to the registerNew
- KeadbyEngland and Wales, Thermal (gas, biomass, waste)Left the register (755 MW connected + 155 MW from 1 Oct 2026)155 MW
- Keadby South Power StationEngland and Wales, Thermal (gas, biomass, waste)755 MW now connectedConnected
- Keadby South Power StationEngland and Wales, Thermal (gas, biomass, waste)Connection date moved from 1 Oct 2026 to 30 Apr 2034 (+91 months)+91 mo
- Keadby South Power StationEngland and Wales, Thermal (gas, biomass, waste)Status changed from Scoping to Built
- Keadby South Power StationEngland and Wales, Thermal (gas, biomass, waste)Renamed from Keadby 3
- Keadby North Power StationEngland and Wales, Thermal (gas, biomass, waste)Renamed from Keadby Hydrogen
- BriggEngland and Wales, Thermal (gas, biomass, waste)Customer changed from CENTRICA BRIGG LIMITED to CBS ENERGY STORAGE ASSETS UK LIMITED
- Keadby South Power StationEngland and Wales, Thermal (gas, biomass, waste)Added to the registerNew
- KeadbyEngland and Wales, Thermal (gas, biomass, waste)Connection point changed from Keadby GSP to Keadby 400kV Substation
- Keadby IIEngland and Wales, Thermal (gas, biomass, waste)Connection point changed from Keadby GSP to Keadby 400kV Substation
- Keadby North Power StationEngland and Wales, Thermal (gas, biomass, waste)Connection point changed from Keadby GSP to Keadby 400kV Substation
- Keadby North Power StationEngland and Wales, Thermal (gas, biomass, waste)Added to the registerNew
- BriggEngland and Wales, Thermal (gas, biomass, waste)Substation name updated in the register (from Keadby 400kV to Keadby 400kV Substation)
- KeadbyEngland and Wales, Thermal (gas, biomass, waste)Substation name updated in the register (from Keadby to Keadby GSP)
- Keadby IIEngland and Wales, Thermal (gas, biomass, waste)Substation name updated in the register (from Keadby to Keadby GSP)
- KeadbyEngland and Wales, Thermal (gas, biomass, waste)Capacity changed from 0 MW to 155 MW
- KeadbyEngland and Wales, Thermal (gas, biomass, waste)Connection date set to 1 Oct 2026
- Keadby IIEngland and Wales, Thermal (gas, biomass, waste)893 MW now connectedConnected
- Keadby IIEngland and Wales, Thermal (gas, biomass, waste)Status changed from Consents Approved to Built
- Keadby IIEngland and Wales, Thermal (gas, biomass, waste)Connection date moved from 22 Jun 2021 to 22 Oct 2021 (+4 months)+4 mo
- Keadby IIEngland and Wales, Thermal (gas, biomass, waste)Connection date moved from 30 Dec 2020 to 22 Jun 2021 (+6 months)+6 mo
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?