Whitewall Road
Peak Reserve Power LLP at Kingsnorth
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 17 Nov 2023
- Status
- Connected
- Customer
- Peak Reserve Power LLP
- Site name
- Whitewall Road
- Address
- Medway, Rochester, Kent, ME2 4DZ
- Grid reference
- Easting 574769, northing 169673
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Kingsnorth
- Bulk supply point
- Not stated
- Primary substation
- Strood 11kV
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Gas turbine (OCGT): 5 MW registered
- Registered capacity
- 5 MW
- Maximum export capacity
- 5 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1900092421122
- Import MPAN
- 1900092421169
- Last updated
- 14 Jun 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Kingsnorth
GSP view17 other sites at this grid supply point in the November 2026 edition, 1 of them at Strood 11kV, the same primary substation. In all, the sites here total 241 MW: 125 MW connected, 116 MW accepted to connect.
- Medway Enterprise CentreReliance Energy Limited, Gas and other fossil, Strood 11kV primaryConnected20 MW
- Kingsnorth Power StationMedway Energy Recovery Limited, Bioenergy and waste, Kingsnorth Grid 132kV primaryAccepted49.9 MW
- Kingsnorth Works 324531Ashford Power Limited, Gas and other fossil, Kingsnorth Grid 11kV primaryConnected21 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?