- Date connected
- 6 May 2025
- Status
- Connected
- Customer
- AMP PLC
- Site name
- (ANM) Hatfield Grid
- Address
- Dellsome Lane, Colney Heath, Hertfordshire, AL4 0QT
- Grid reference
- Easting 521300, northing 205754
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Elstree
- Bulk supply point
- Hatfield Grid 33kV
- Primary substation
- Hatfield Primary 11kV
- Connection voltage
- 11 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 5.1 MW registered
- Registered capacity
- 5.1 MW
- Maximum export capacity
- 5.1 MW
- Maximum import capacity
- 5.06 MW
- Flexible connection
- Yes
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- 1050003122416
- Import MPAN
- Not stated
- Last updated
- 14 Aug 2025
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Elstree
GSP view19 other sites at this grid supply point in the October 2026 edition, 1 of them at Hatfield Primary 11kV, the same primary substation. In all, the sites here total 225 MW: 157 MW connected, 68 MW accepted to connect.
- Gyron Maylands DatacentreGyron Internet Limited, Gas and other fossil, Industrial Primary 11kV primaryConnected8 MW
- Mirror Colour Print LtdTrinity Mirror, Gas and other fossil, Bushey Mill Grid 11kV primaryConnected7.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose