Snodland Paper Mill
Smurfit Kappa Townsend Hook at Kingsnorth
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 20 Apr 2015
- Status
- Connected
- Customer
- Smurfit Kappa Townsend Hook
- Site name
- Snodland Paper Mill
- Address
- Mill Street, Snodland, Kent, ME6 5AX
- Grid reference
- Easting 570768, northing 161692
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Kingsnorth
- Bulk supply point
- Medway Grid 33kV
- Primary substation
- Townsend Hook 6.6kV
- Connection voltage
- 6.6 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Other, Other: 1.2 MW registered
- Registered capacity
- 1.2 MW
- Maximum export capacity
- 1.2 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1900091206194
- Import MPAN
- Not stated
- Last updated
- 15 Jan 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Kingsnorth
GSP view17 other sites at this grid supply point in the November 2026 edition, 2 of them at Townsend Hook 6.6kV, the same primary substation. In all, the sites here total 241 MW: 125 MW connected, 116 MW accepted to connect.
- Sca Packaging East Mill 394942Blossence Aylesford Limited, Solar, Townsend Hook 6.6kV primaryConnected4.5 MW
- Kingsnorth Power StationMedway Energy Recovery Limited, Bioenergy and waste, Kingsnorth Grid 132kV primaryAccepted49.9 MW
- Kingsnorth Works 324531Ashford Power Limited, Gas and other fossil, Kingsnorth Grid 11kV primaryConnected21 MW
- Medway Enterprise CentreReliance Energy Limited, Gas and other fossil, Strood 11kV primaryConnected20 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?