QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Potters Bar Solar Farm

UK Sustainable Energy Limited at Elstree

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
31 Mar 2017
Status
Connected
Planning consent
Granted 18 Dec 2015
Hertsmere, reference 15/1289/FUL · Source: REPD
Customer
UK Sustainable Energy Limited
Site name
Potters Bar Solar Farm
Address
Cranborne Road, Potters Bar, Hertfordshire, EN6 3JR
Grid reference
Easting 524300, northing 202480
Licence area
Eastern Power Networks (EPN)
Grid supply point
Elstree
Bulk supply point
Hatfield Grid 33kV
Primary substation
West Potters Bar Primary 11kV
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 4.5 MW registered
Registered capacity
4.5 MW
Maximum export capacity
4.5 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1050001299965
Import MPAN
Not stated
Last updated
14 Feb 2024
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Elstree

GSP view

18 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 223 MW: 157 MW connected, 66 MW accepted to connect.

  • Lye Green Solar FarmExagen Development Limited, SolarAccepted50 MW
  • Tollgate FarmBrockwell Storage & Solar Limited, StorageConnected49.5 MW
  • Spring WayEnergetics Electricity, Gas and other fossilConnected30 MW
  • Eastman WayUK PowerReserve Limited, Gas and other fossilConnected20 MW
  • Tollgate FarmBrockwell Storage & Solar Limited, SolarAccepted16 MW
  • Gyron Maylands DatacentreGyron Internet Limited, Gas and other fossil, Industrial Primary 11kV primaryConnected8 MW
  • Mirror Colour Print LtdTrinity Mirror, Gas and other fossil, Bushey Mill Grid 11kV primaryConnected7.2 MW
  • Booker Cash & CarrySterling Power Utilities, Gas and other fossil, Tunnel Primary 11kV primaryConnected5.5 MW

See all 18

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.