QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Land Part Of Swan Lane Pier

Disco Powered Limited at City Road

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Disco Powered Limited
Site name
Land Part Of Swan Lane Pier
Address
City Of London, London, EC4R 3AF
Grid reference
Easting 532722, northing 180673
Licence area
London Power Networks (LPN)
Grid supply point
City Road
Bulk supply point
Bankside C 11kV
Primary substation
Not stated
Connection voltage
11 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 1.5 MW registered
Registered capacity
1.5 MW
Change to maximum export capacity
1.5 MW
Change to maximum import capacity
1.5 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
28 May 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Feb 2025
Tracked since
September 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked from the September 2026 edition to the October 2026 edition, across 2 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No change to any detail QueueWatch tracks.

Also at City Road

GSP view

13 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 34.2 MW: 34.2 MW connected.

See all 13

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?