Citigen
Citigen at City Road
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Oct 2015
- Status
- Connected
- Customer
- Citigen
- Site name
- Citigen
- Address
- 47-53 Charterhouse Street, Barbican, London, EC1M 6AH
- Grid reference
- Easting 531930, northing 181969
- Licence area
- London Power Networks (LPN)
- Grid supply point
- City Road
- Bulk supply point
- Finsbury Mkt F 33kV
- Primary substation
- Beech St A 11kV
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 8.7 MW registered
- Registered capacity
- 8.7 MW
- Maximum export capacity
- 8.7 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1200010261399
- Import MPAN
- Not stated
- Last updated
- 13 Nov 2020
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at City Road
GSP view12 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 34.2 MW: 34.2 MW connected.
- Moorhouse management Services Ltd BNP Paribas, MoorhouseMoorhouse management Services Ltd BNP Paribas, Moorhouse, Gas and other fossil, Beech St B 11kV primaryConnected3.2 MW
- 60 Victoria Embankment60 Victoria Embankment, Gas and other fossil, Bankside C 11kV primaryConnected3 MW
- British American TobaccoBritish American Tobacco, Gas and other fossil, Kingsway 11kV primaryConnected1.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?