Kentish Farm 1
Kentishes Solar Farm 3 Limited at Braintree
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2030
- Status
- Accepted to connect
- Customer
- Kentishes Solar Farm 3 Limited
- Site name
- Kentish Farm 1
- Address
- Stisted, Braintree, Essex, CM77 8BX
- Grid reference
- Easting 579270, northing 226160
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Braintree
- Bulk supply point
- Braintree Local 33kV
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 6.7 MW registered
- Registered capacity
- 6.7 MW
- Change to maximum export capacity
- 6.7 MW
- Change to maximum import capacity
- 5 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 29 Aug 2017
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- 105014-210323
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 Nov 2026
- Tracked since
- September 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionTarget energisation date moved from 6 Jan 2025 to 31 Oct 2030 (70 months later)
Also at Braintree
GSP view16 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 215 MW: 159 MW connected, 56 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?