(ANM) Land At Cressing Farm

Eden CF Solar Limited at Braintree

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Mar 2026
Status
Accepted to connect
Customer
Eden CF Solar Limited
Site name
(ANM) Land At Cressing Farm
Address
Braintree, Essex, CM77 8PD
Grid reference
Easting 579757, northing 218798
Licence area
Eastern Power Networks (EPN)
Grid supply point
Braintree
Bulk supply point
Braintree Local 33kV
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 13.8 MW registered
Registered capacity
13.8 MW
Change to maximum export capacity
13.8 MW
Change to maximum import capacity
0.1 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
1 Oct 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
105014-210323
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Nov 2026
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2026 edition
    Target energisation date moved from 31 Dec 2024 to 30 Mar 2026 (15 months later)

Also at Braintree

GSP view

16 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 215 MW: 159 MW connected, 56 MW accepted to connect.

See all 16

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?